Peninsula Hotel, London
Reviewing methodology and programme to produce a 12-month time saving (in 60 months) on the delivery of the Peninsula Hotel, London while collaboratively gaining agreement with the contractor and design team to deliver the saving. This generated an assessed £50m cost reduction – a return on investment for the client of 500:1.